This question was closed without grading. Reason: Other
Dec 2, 2020 20:24
3 yrs ago
11 viewers *
English term
(active) injection
English to Polish
Tech/Engineering
Petroleum Eng/Sci
general
Well Status:
Dry Hole -- P & A - Approved
Injection, Enhanced Oil Recovery -- Active Injection
Dry Hole -- P & A - Approved
Injection, Enhanced Oil Recovery -- Active Injection
Discussion
--------
In the oil industry, waterflooding or water injection is where water is injected into the oil field, usually to increase pressure and thereby stimulate production. Water injection wells can be found both on- and offshore, to increase oil recovery from an existing reservoir. - https://en.wikipedia.org/wiki/Water_injection_(oil_productio...
AA - Intent to Abandon Approved
AI - Active Injection
APA - Appears P&A/No Records
APS - Appears P&A/No Records - surveyor inspection
AU - Abandoned - Unapproved
AUS - Abandoned - Unapproved Surveyor Inspection
CA - Permit Cancelled
CI - Closed In (Producing Well)
COMNG - Comingled for Production
CPL - Completed Wells (Form 3 Recv'd)
CPLNP - Completed Well (Form 3 Recv'd) Not Producing
DA - Dry and Abandoned
DG - Drilling
DGW - Domestic Gas Well
DWW Domestic Water Well
EX - Expired Permit
I - Inactive
JA - Junked and Abandoned
- https://www.ogb.state.ms.us/well_status_list.php
Pytam sporo... choć to i tak niewiele w proporcji do tego zlecenia ;) Większość terminów znajduję; jest też sporo publikacji na ten temat. A co do tych, których nie udało mi się znaleźć lub co do których mam wątpliwości (bo jest kilka odpowiedników i nie wiem, który brzmi lepiej w tym kontekście) wolę się upewnić. Mówią, że kto pyta, nie błądzi ;) Jeśli ktoś podpowie - super; jeśli nie - trudno. Też sobie poradzę :)
Poza tym w tym tekście jest taka mieszanka dziedzin / specjalizacji, że nie sposób doskonale orientować się w nich wszystkich ;)
Pozdrawiam! :)